What is the difference between target costing and kaizen costing?
GradeHunt_TeamGradeHunt Team · · CMA Final
CMA Final SCM theory questions ask about target costing and kaizen costing. They both reduce cost, so how are they different?
target costingkaizen costingstrategic cost managementcma final
1 answer
0
Both aim at lower costs, but they act at different stages of a product's life.
Target costing:
- Used at the design and development stage, before production starts.
- Target cost = expected selling price - required profit margin.
- The product is designed so that its cost does not exceed the target cost, using value engineering and cross-functional teams.
- Market-driven: the price the customer will pay is the starting point.
- Most cost is locked in at design, so this is where large savings are possible.
Kaizen costing:
- Used at the manufacturing stage, after the product is launched.
- Aims at small, continuous cost reductions period after period.
- Targets are set for each period (for example, a 2% reduction a month) and achieved through process improvements suggested largely by workers on the shop floor.
- Focus is on the production process, not the product design.
Key differences in one line each:
- Stage: design vs production.
- Size of change: large, one-time design changes vs small, continuous improvements.
- Who drives it: design and engineering teams vs operators and supervisors.
- Starting point: market price vs current actual cost.
How they fit together: target costing sets a cost the product can reach, and kaizen costing keeps lowering it after launch. Many firms use both.
Exam tip: end a theory answer with this link between the two. It shows you understand how the two methods work together, not just the definitions.